Based on construction drawings and on-site conditions, various piping materials and components are prefabricated and modularized in advance.
  1. Drawing breakdown, drafting and dimension verification

    1 Drawing Breakdown, Drafting & Dimension Verification

    Break down and review the design drawings, completing dimensional verification and notation for construction.

  2. Material preparation and verification

    2 Material Preparation & Verification

    Prepare materials according to the list and verify the material type, specifications, quantity, and inspection status.

  3. Hole drilling and pipe cutting

    3 Hole Drilling & Pipe Cutting

    Drill holes according to positioning and use jigs for cutting to ensure accurate hole positions and cutting precision.

  4. Pipe coding, assembly and welding

    4 Pipe Coding, Assembly & Welding

    Code and pre-assemble the pipes according to drawings, completing positioning and welding for fast on-site alignment.

  5. Weld inspection

    5 Weld Inspection (Primary-Level Inspection by Our Company)

    Conduct visual and non-destructive testing in accordance with standards to ensure weld quality and safety.

  6. Final assembly, shipment and on-site lifting support

    6 Final Assembly, Shipment & On-Site Lifting Coordination

    After packaging and labeling, materials are consolidated and shipped, coordinated with on-site lifting and installation.